Request for Qualifications for Construction Manager at Risk (CMR) Services
DAS Construction Services
- Deadline
- December 3, 202612 days left
- Contract value
- $18MStated in the notice.
- Set-aside
- None stated
What it is
CTsource BI-MH-139-CMR-2: Request for Qualifications for Construction Manager at Risk (CMR) Services. BI-MH-139-CMR-2, GBCMHC - Sprinkler System and Related Renovations, 1635 Central Avenue, Bridgeport CT. The Greater Bridgeport Community Mental Health Center (GBCMHC) is an 8-story mental health facility approximately 144,000 sq. ft. that has roughly 100 in-patients residing within the building full-time as well as out-patient services. GBCMHC provides mental health treatment, food services, administration offices, conference rooms and a pharmacy for its clients. It is a high-rise building, and as such, is required to have an approved working sprinkler system per the Joint Commission which adopted the NFPA Code 101® 2012 edition of the Life Safety Code as well as the NFPA 99® 2012 edition of the Health Care Facilities Code. All work must comply with ASHRAE 170, NFPA 99, and JC EC 02.05.01 The building will remain occupied during construction; the work will be phased and carefully coordinated with facility stakeholders to minimize disruptions. See the RFQ for full details.
From the official listing, in the buyer's own words.
Who can bid
- Businesses registered to sell to this buyer
The notice names no set-aside, so it is not limited to one type of firm.
What it is worth
$18M
Stated in the notice.
Notice details
- Notice type
- DAS-CS Request for Qualifications
- Line of work
- construction
- NAICS
- 23
Rules on AI-written applications
No AI policy found — check the funder's guidelines
Other open notices like this
- RFQ Construction Manager at Risk Services-Oakville Ave DevelopmentWaterbury Housing AuthorityDue Nov 23, 2026
- Level 2 Alterations for the William H. Warner VillageElderly Housing Management IncDue Nov 24, 2026
- Rehabilitation of A 0.41 Mile Section of Hunters Road and Culverts ReplacementNorwich, City ofDue Nov 27, 2026
- Replacement of Pine Tree Drive and Peck Lane Culverts Over Tumble BrookOrange, Town ofDue Dec 1, 2026